Skip to Main Content

THANKSGIVING HOURS - We'll be closed Wednesday, November 25, 2026 through Sunday, November 29, 2026, reopening Monday, November 30, 2026 with regular hours

THANKSGIVING HOURS - We'll be closed Wednesday, November 25, 2026 through Sunday, November 29, 2026, reopening Monday, November 30, 2026 with regular hours

Bathroom Conversions & Remodeling in Nashville and Middle Tennessee

In short: 180 Degree Floors does full bathroom conversions, not just cosmetic updates: we take a bathroom down to the studs, waterproof it with a membrane system, and rebuild it with tile, fixtures, and flooring — one licensed general contractor from demolition to finish. That includes tub-to-shower conversions and turning a half bath into a full bath. We have served Middle Tennessee since November 2008. Free in-home consultation and measurement: (615) 788-1379.

  • Services: Full bathroom conversions, tub-to-shower conversions, half-bath to full-bath conversions, waterproofing, tile showers and floors, vanity installation, waterproof/LVP bathroom flooring
  • Who we serve: Homeowners across Nashville and Middle Tennessee
  • Service area: Nashville, Murfreesboro, Franklin, Green Hills, Brentwood, Hendersonville, and Middle Tennessee
  • Contractor: Licensed general contractor — 180 Degree Floors & Moore LLC
  • In business since: November 2008
  • Estimate: Free in-home consultation and measurement

What is a full bathroom conversion, and what does it include?

A full bathroom conversion is a gut-to-finish rebuild: the old bathroom comes out down to the studs, the new one is waterproofed and built back in the right order. A surface refresh — paint, a vanity swap, new hardware — changes how a bathroom looks. A conversion changes what is behind the walls and under the tile, which is where bathrooms actually fail.

A full conversion with 180 Degree Floors includes:

  • Demolition to the studs — Old tile, tub or shower, flooring, and fixtures come out, and the framing, subfloor, and plumbing are exposed so problems are visible instead of buried.
  • Waterproofing — A membrane waterproofing system (the project photos on this page show a Schluter-Kerdi system) is installed over the shower walls, floor, niche, and bench before any tile goes on.
  • Tile showers and floors — Tile is laid out dry first so the pattern lands right, then set by hand, wall to wall — including patterned and geometric tile.
  • Shower bench and niche — Built into the waterproofing and tile work, not added on after.
  • Tub-to-shower or shower-to-tub changes — The footprint is rebuilt for the new fixture, including the drain and floor slope a shower needs.
  • Vanity installation — Vanity set and plumbed in as part of the rebuild, not left as a separate project.
  • Bathroom flooring — Tile, or waterproof/LVP flooring suited to a wet room, installed over the prepared subfloor.

A full conversion we photographed at every stage — finished shower with tiled niche and bench.

Finished bathroom conversion shower with geometric tile, tiled niche and bench

How does a bathroom conversion work, step by step?

The order below is the order in our project photos, because the order is the job:

  1. Gut to the studs. Everything old comes out. Framing, subfloor, and plumbing are exposed and checked — this is the only moment hidden rot or a bad subfloor can be found and fixed honestly.
  2. Correct what's underneath. Subfloor and framing issues found at the gut are addressed before anything new goes in.
  3. Waterproof before a single tile. The membrane system goes over the shower floor, walls, niche, and bench, so water that gets past grout or tile meets a waterproof layer, not bare board.
  4. Lay the tile out dry. Pattern tile is dry-laid first, so the design is centered and lands right before it is set permanently.
  5. Set the tile by hand. Walls, floor, niche, and bench are tiled and grouted.
  6. Finish the room. Vanity, fixtures, and flooring are installed, and the bathroom goes back into service as a finished room.

Can you convert my tub into a walk-in shower?

Yes — a tub-to-shower conversion is one of the most common full conversions we do. The tub comes out, the floor is rebuilt with the slope and drain position a shower requires, the new shower area is waterproofed as a full system, and the shower is tiled with a niche and, where the space allows, a bench. Because the floor and drain work happens under the tile, this is a conversion, not a kit placed over the old tub — and it is planned at the in-home consultation, where we can see your actual footprint, plumbing position, and doorway access before recommending a layout.

Can a half bath become a full bath?

Yes — a half-bath to full-bath conversion adds a shower (or tub) to a room that today has only a toilet and sink. Whether your specific half bath can take a shower depends on the room's dimensions, where the drain and supply lines can run, and what is under the floor — which is exactly what the free in-home consultation and measurement is for. If the space works, the conversion follows the same gut-to-finish process: waterproofing first, then tile, fixtures, vanity, and flooring. If the space honestly does not work, we will tell you at the consultation rather than sell you a layout that fails.

Why does waterproofing matter so much in a bathroom conversion?

Because tile and grout are not waterproof — they never have been. Water passes through grout lines and any hairline crack, slowly, for years. What protects the house is the waterproof layer behind the tile. A conversion that skips proper membrane waterproofing can look perfect on day one and rot the framing behind the wall for a decade before anyone sees it. That is why our process waterproofs the shower floor, walls, niche, and bench as one system before a single tile is set — and why the photos on this page show that stage in full, not hidden. When you compare quotes, ask every contractor what waterproofing system they install and whether you can see it before the tile goes on.

How long does a bathroom conversion take?

There is no honest one-size answer, and any contractor who gives you a firm timeline without seeing your bathroom is guessing. Duration depends on the size of the room, whether it is a like-for-like rebuild or a layout change like a tub-to-shower or half-to-full conversion, the tile and pattern involved, and what the gut reveals underneath — a rotted subfloor found at demolition has to be fixed, and that changes the schedule. What we can promise is a schedule built from your actual bathroom, given at the estimate after we have measured it — not a standard package timeline.

How do I prepare for a bathroom conversion?

  • Plan for the bathroom to be out of service. A gut-to-finish conversion means that room is a work site, not a bathroom, until the finish stage. Make sure another bathroom can carry the household, or plan accordingly.
  • Clear the room completely. Vanity contents, shower items, rugs, and anything stored in the room need a temporary home before demolition day.
  • Decide your fixtures and tile before the gut, if you can. Tile pattern, vanity, and fixtures chosen early keep the schedule moving; mid-job changes are the most common cause of delays on any remodel.
  • Think about access and parking. Crews and material need a path in and a place to stage tile and the demo debris.
  • Tell us about the house. Water shutoff location, known plumbing quirks, and any past leak history in that bathroom all help — past leaks are exactly what the gut is checking for.

How does the estimate for a bathroom conversion work?

It starts with a free in-home consultation and measurement. We visit, measure the room, look at the existing layout, fixtures, and flooring, talk through what you want the finished bathroom to be, and then give you an estimate for that scope. Bathroom conversions vary too much — room size, layout changes, tile, fixtures, and whatever is hiding under the old floor — for an honest price to come from a phone description or a square-foot guess. The on-site look is what prevents the most common remodeling problem: a low quote that grows the moment the wall comes open.

Full conversion vs. surface refresh vs. doing it yourself

Full conversion with 180 Degree Floors — Bathroom is gutted to the studs, waterproofed as a system, and rebuilt — tile, fixtures, vanity, flooring — by one licensed general contractor. The catch: the bathroom is out of service during the work, and the gut can reveal repairs the room needed anyway.

Surface refresh — Paint, a new vanity, hardware, maybe a floor laid over the old one. The catch: changes the look only. Whatever is behind the tile and under the floor — including failed waterproofing or rot — stays exactly as it was.

DIY conversion — You handle demo, waterproofing, tile, and plumbing tie-ins yourself. The catch: waterproofing and drain slope are unforgiving: mistakes usually stay hidden until water has been damaging framing for years, and fixing them means tearing out finished tile.

Where do you do bathroom conversions?

We do bathroom conversions across Nashville and Middle Tennessee, including Murfreesboro, Franklin, Green Hills, Brentwood, and Hendersonville. We are based in Nashville, and bathroom work is scheduled from the in-home consultation — call and we will set up a time to measure your bathroom and talk through the conversion you have in mind.

Bathroom Conversions FAQs

Full bathroom conversions are a core part of what we do — gut-to-finish remodels including demolition to the studs, waterproofing, tile showers and floors, vanity installation, and bathroom flooring, all under one licensed general contractor. Flooring is where the company started, but a conversion is a whole-room build, and we run it that way.

Yes. The tub comes out, the floor is rebuilt with the correct slope and drain position, the shower area is waterproofed as a full membrane system, and the new shower is tiled — with a niche and, where space allows, a bench. We confirm the layout fits your footprint at the free in-home consultation before any work is quoted.

Often, yes. It depends on the room's dimensions and whether drain and supply lines can be run where a shower needs them, which we check at the in-home consultation and measurement. If it works, it follows the same gut-to-finish conversion process. If it honestly does not, we will say so at the consultation.

A membrane waterproofing system installed over the shower floor, walls, niche, and bench before tile — the project photos on this page show a Schluter-Kerdi system at exactly that stage. Tile and grout alone are not waterproof; the membrane behind them is what protects your framing.

It depends on the scope — room size, whether the layout changes, tile and fixture selections, and what the demolition reveals underneath. Those variables are why we do not publish a price list that would mislead you. The free in-home consultation and measurement produces an estimate for your actual bathroom and the conversion you actually want.

For the full conversion period — a gutted bathroom is a work site until the finish stage. The schedule is built from your bathroom's size, scope, and what the gut reveals, and it is given at the estimate, not promised from a template. Plan on your other bathroom carrying the household during the work.

No, in most homes. The work is contained to the bathroom being converted, though you should expect noise, crew access, and material staging during work hours. The main planning point is bathroom access: if the home has only one bathroom, we will talk honestly at the consultation about how to sequence the work.

Yes — the tile, pattern, vanity, and fixtures are your choices, and choosing them before demolition starts is one of the best things you can do for the schedule. We will tell you plainly if a selection has an installation or durability issue in a wet room, but the look of the finished bathroom is yours.

A firm price before anyone measures the room is a guess, so the useful answer is what the price is built from: the size of the bathroom, whether the layout stays or plumbing moves, how much tile and waterproofing the design uses, the fixtures and vanity selected, and what the walls and subfloor look like once the old bathroom comes out. A proper estimate is itemized from an on-site look at your actual bathroom, not a per-project average from the internet. 180 Degree Floors builds bathroom conversion estimates from an in-home visit in the Nashville area, with the tile work and waterproofing in the same contract as the rest of the job. Call (615) 788-1379.

The timeline is driven by scope, not a standard number: a like-for-like conversion with the layout unchanged runs on a different clock than a gut remodel that moves plumbing, and custom tile and glass add curing and fabrication time that cannot be rushed without hurting the result. Material lead times and what demolition uncovers in the walls and subfloor also move the date. A written schedule tied to your specific scope — not a generic promise — is what you should expect before work starts. 180 Degree Floors scopes bathroom conversions in Middle Tennessee with the waterproofing, tile, and finish work sequenced by one crew. Call (615) 788-1379.

A full bathroom conversion runs in this order: demolition to the studs and subfloor, plumbing and electrical rough-in, waterproofing of the wet areas, tile and flooring, then fixtures, vanity, and finishes. Waterproofing before tile is the step that decides whether the shower lasts, and it is the step most often skipped in cheap bids. 180 Degree Floors performs full gut-to-finish bathroom conversions in the Nashville area, including the waterproofing and tile work, so no phase is handed off to a stranger. Call (615) 788-1379.

The mistakes that cost the most are: skipping or skimping on waterproofing behind tile, choosing tile for looks without checking where it will be used, moving plumbing without budgeting for what is inside the walls, ordering fixtures after demolition instead of before, and hiring separate trades with no one accountable for how the phases fit together. Each one is avoidable at the planning stage and expensive after tile is set. 180 Degree Floors plans conversions in Middle Tennessee around the waterproofing system first — it warranties its tile work through Schluter systems — and sequences the whole job under one contract. Call (615) 788-1379.

Converting a tub to a walk-in shower makes sense when the tub is rarely used, when stepping over the tub wall is getting harder, or when the shower is the bathroom's real daily workspace — and it is the single most requested change in the conversions we scope. On resale: converting the home's only tub can narrow the buyer pool for families with small children, while converting one of two or more tubs is generally a non-issue. The right answer depends on your house and how long you plan to stay in it. 180 Degree Floors builds tub-to-shower conversions across the Nashville area with full waterproofing behind the tile. Call (615) 788-1379.

A tile shower's cost is built, not flat: the size of the shower, the waterproofing system behind the tile, the tile itself and how intricate the pattern is, whether the shower floor is a formed pan or a custom build, and the plumbing and glass the design calls for. The waterproofing line is the one never to cut — it is invisible in the finished shower and it is what keeps water out of the walls. An itemized estimate from an on-site measurement separates those pieces so you can see where the money goes. 180 Degree Floors estimates tile showers in Middle Tennessee with the Schluter waterproofing system in the same contract as the tile. Call (615) 788-1379.

The pros: a tile shower is fully custom — any size, bench, niche, or layout — it is durable, repairable in sections, and it is the finish buyers associate with a quality bathroom. The downsides: it costs more and takes longer than a fiberglass or acrylic insert, and its long life depends entirely on the waterproofing behind it and on grout and caulk being maintained as wear items. An insert wins on speed and budget; tile wins on fit, feel, and longevity when it is built on a real waterproofing system. 180 Degree Floors builds tile showers in the Nashville area on Schluter waterproofing — Schluter is how 180 warranties its tile work. Call (615) 788-1379.

A properly waterproofed shower has a continuous waterproof layer behind and under every tiled surface in the wet zone — walls, floor, curb, bench, and niches — with seams and corners sealed as one system, and the drain tied into that layer so water that gets past the grout is directed to the drain instead of the wall cavity. Paint-on-only or skipped-membrane builds rely on grout to stop water, and grout is not waterproof. 180 Degree Floors waterproofs its Nashville-area showers with Schluter systems, and Schluter is how 180 warranties its tile work. Call (615) 788-1379.

Porcelain and ceramic tile are the workhorses for shower walls and floors: dense, low-absorption, and available in any look from stone to wood. On the shower floor, smaller tile follows the slope to the drain and gives more grout lines for grip. Natural stone can be used but needs sealing and more upkeep, and large slick polished tile on a shower floor is the combination to avoid. The best choice also depends on your waterproofing and layout, which is why tile selection belongs in the design visit, not after demolition. 180 Degree Floors helps Middle Tennessee homeowners select shower tile as part of the conversion scope, over Schluter waterproofing. Call (615) 788-1379.

About 180 Degree Floors

180 Degree Floors & Moore LLC has served Middle Tennessee since November 2008. Ronell D. Moore is a licensed general contractor with roughly 17 years in the trades, and the company built its name on flooring before adding full-room work — which is why this page shows you the whole conversion, including the stages most companies never photograph: the studs, the waterproofing, and the tile before it was grouted. Proof, not a promise: every photo on this page is our own work, shown in the order it happened.

Free in-home consultation and measurement. Call (615) 788-1379.

Tell us what bathroom you want to convert, what it has today — tub, shower, or half bath — and what you want it to become. We will set up a time to measure it and give you an estimate for that scope.