Skip to Main Content
— —
—

—

Liberty School gymnasium with exposed floor joists during demolition

Liberty School

Institutional Facility Flooring System Replacement — Nashville, Tennessee, School Gymnasium / Assembly Space

Removal of existing hardwood gym flooring and structural subfloor system. This project required complete flooring system replacement to restore structural integrity and long-term facility use.

Scope of Work

Full demolition of existing hardwood flooring

Removal of deteriorated subfloor system

Structural inspection of joist system

Installation of new structural subfloor

Installation of commercial flooring system

Details

Environment: School Gymnasium / Assembly Space

Project Type: Institutional facility flooring turnover

Location: Nashville, Tennessee

Call (615) 788-1379 to schedule a site walk.